logo

Shenzhen Weixin Plastic Machinery Factory z18925264677@gmail.com 86-189-2526-4677

Shenzhen Weixin Plastic Machinery Factory Company Profile
News
Home > News >
Company News About “How German Engineers Keep 10-Year-Old Machines Running Like New”

“How German Engineers Keep 10-Year-Old Machines Running Like New”

2025-08-10
Latest company news about “How German Engineers Keep 10-Year-Old Machines Running Like New”

The Ultimate Maintenance Guide for Fully Automatic Positive & Negative Pressure Machines: Maximize Lifespan of Your Second-hand Equipment

Why Maintenance Matters More for Second-hand Machines

"A well-maintained 10-year-old machine outperforms a neglected new model."

For overseas buyers of refurbished plastic thermoforming equipment, proactive maintenance is your secret weapon to:

  • Achieve 98%+ uptime comparable to new machines
  • Reduce energy consumption by up to 25%
  • Extend equipment lifespan beyond 15 years

Core Maintenance Checklist - Engineer Recommended

1,Daily Operator Tasks (5 Minutes/Day)

Vacuum Pump Care

  • Check oil level (Viewing port at 3/4 full)
  • Monitor exhaust temperature (<85℃/185℉)
  • Listen for abnormal noises (Whining = bearing wear)

Pressure System Check

  • Test emergency stop response
  • Verify pressure gauge stability (±0.1 bar)

2,Weekly Technician Actions (30 Minutes/Week)

Seal Integrity Test

  • Apply soap solution to pipe connections → Check for bubbles
  • Measure vacuum drop rate (<0.5 mbar/min when sealed)

Lubrication Protocol

  • Grease linear guides with Mobilith SHC 100 (High-temp resistant)
  • Oil pneumatic cylinders per ISO 6431 standard

Electrical Safety Inspection

  • Tighten terminal connections (Torque: 1.2-1.5 Nm)
  • Check ground resistance (<0.1Ω)

3,Quarterly Deep Maintenance (4 Hours/Quarter)

System Critical Procedure Tool Required
Vacuum System Replace oil mist filter + Rotor gap check Feeler gauge (0.03-0.05mm)
PLC Controls Backup programs + Clean heat sinks Thermal camera
Hydraulic Unit Change oil (ISO VG 46) + Flush lines Particle counter (NAS 9)
Frame Alignment Verify platen parallelism (<0.1mm/m) Laser collimator

Pro Tips for Refurbished Equipment Owners

The 90-Day Reset Rule

  • After acquiring second-hand machines:
    • Flush vacuum pump oil 3 times (20-min runs between changes)
    • Replace all pneumatic seals (Nitrile for <60℃/ Viton for >60℃)
  • Why? Removes debris from previous operation

"Our refurbished machines include FREE lifetime maintenance consulting – Because your success is our warranty."

Want to learn more?

Contact us now for full machine details, videos, pricing and custom configurations!

Events
Contacts
Contacts: Mrs. Zeng
Contact Now
Mail Us